Flash Deck Logo

Certification Quizzes

Manage modules, questions, and study materials.

Study Material PDF

Upload a PDF that contractors can review before taking the Metal Base quiz.

5 questions in this module

1

Valley Redundancy: When detailing a valley, which product must be installed first, and what is the specific installation sequence for the primary Flash Deck® Metal Base over it?

Flash Deck® Strip-In is installed first, then the Metal Base is centered in the valley with a minimum 6” overlap from field courses.
Metal Base and Strip-In are installed simultaneously by folding them together into the valley crease.
Flash Deck® Metal Base is installed first, followed by Strip-In centered over the valley crease.
The metal valley flashing is installed first, followed by a single layer of Metal Base with no Strip-In required
2

Technical Capabilities: What is the maximum service temperature rating for the butyl adhesive, and what is the maximum allowable UV exposure time?

Service Temp: 300°F; UV Exposure: 1 Year.
Service Temp: 240°F; UV Exposure: 6 Months.
Service Temp: 180°F; UV Exposure: 90 Days.
Service Temp: 200°F; UV Exposure: 30 Days.
3

Superior Eave Details: In the "Superior" Eave Installation option, what is the specific placement of the Flash Deck® Strip-In relative to the metal drip edge?

Strip-In is only used if the drip edge is missing or damaged.
Strip-In is wrapped around the nose of the drip edge after the Metal Base is down.
Strip-In is installed directly onto the deck first (overlapping the fascia), underneath the drip edge.
Strip-In is applied directly over the top of the drip edge nail flange.
4

Enhanced Eave Option: When executing the "Enhanced" Eave Installation, what is the correct sequence of materials?

Drip edge first, then Metal Base over the flange, then roll.
Strip-In onto the deck first, then drip edge, then Metal Base over the top.
Metal Base onto fascia first, then drip edge, then Strip-In extending a minimum of 4" onto the Metal Base.
Drip edge first, then Strip-In, then Metal Base.
5

Ice Dam Prevention Protocols: To protect against ice damming, what is the recommended installation distance for the underlayment relative to the building's walls?

It must terminate exactly at the exterior wall line.
It must be installed from the eave up to a point at least 36" inside the exterior wall line (above the max ice dam buildup line).
It must cover the entire lower half of the roof, regardless of wall location.
It must extend 12" past the interior ceiling joists.